Standardized operation of road roller during run-in period


In the process of using the small road roller, in fact, the occurrence of failures is beyond our expectation, because it is not expected, so once the failure occurs, everyone is often caught off guard and does not know how to deal with it. For example, if the small road roller is in the The engine suddenly doesn't start while driving, do you know the reason? In fact, when you are driving a small road roller, if you do a good job in the running-in period, you can actually reduce the breakdown. To prevent the failure of small road rollers, the running-in period should be operated in a standardized manner.


road roller.jpg


If there are some failures in the use of small road rollers, it will cause delays in work. If the engine does not start. Possible reasons are:


     1. Check the control position to see if the fuel valve is open or not, and turn the valve to open. Close the choke door and turn on the engine switch of the small road roller.


     2. Check the fuel. If the fuel is gone, add fuel. It may also be that the fuel has deteriorated. In this case, it is necessary to change the fuel.


     3. Remove the spark plug for inspection, clean and adjust the gap or replace it with a new spark plug. If the spark plug is soaked by fuel, dry it and reinstall it, and pull the valve lever to the faster position.


     No one can guarantee that their small road rollers will not fail, so the operators of ordinary small road rollers should have a general understanding of some relevant mechanical working principles in case of emergency. After the small road roller leaves the factory, it is generally stipulated that there is a running-in period of about 60 hours (some are called run-in periods), which is stipulated by the manufacturing factory based on the technical characteristics of the construction machinery at the initial stage of use. The running-in period is an important link to ensure the normal operation of construction machinery, reduce the failure rate, and prolong its service life.


     But at present, some users ignore the special technical requirements of the running-in period of the new machine due to lack of common knowledge on the use of construction machinery or because of tight construction schedules or want to get benefits as soon as possible. Some users even think that, anyway, the manufacturer has a warranty period, and the manufacturer is responsible for repairing the small road roller if it breaks down, so the machine will be overloaded for a long time during the running-in period, resulting in frequent early failures of the machine, which not only affects the normal use of the machine , which shortens the service life of the machine, and also affects the progress of the project due to machine damage. Therefore, enough attention should be paid to the use and maintenance of the break-in period of the wheel loader.


CONTACT US

Contact: Ms. Anna

Phone: +8613964983086

E-mail: Alex.cui@storike.com

Add: Incalcu Industrial Park, 327 National Road, High-tech Zone, Jining City, China., Jining, Shandong, China

Scan the qr codeclose
the qr code